Investalks 马来西亚中文投资论坛 - 与你一起通往财务自由之路

 找回密码
 注册

最近看过此主题的会员

楼主: 大时代

[公司专区] 5205 SENDAI 艾華仙台

  [复制链接]
x 178
发表于 2012-4-18 19:50 | 显示全部楼层
Eversendai gets RM134m sub-contract for Qatar museum

KUALA LUMPUR: Eversendai Corporation Bhd's subsidiary has secured a RM134mil sub-contract for the second package of the National Museum of Qatar.

It said on Wednesday the subsidiary, Eversendai Engineering Qatar W.L.L, was awarded the contract by the main contractor Hyundai Engineering & Construction Co. Ltd. The scope of work includes design, fabrication and building of steel structures.

Earlier this year, the group secured Package 1 of the museum project amounting to about RM81mil.

“Work on this contract is expected to be completed in 2013 and will have a positive impact on the group's financial performance for FY2012 and FY2013,” Eversendai said.
http://biz.thestar.com.my/news/s ... 55&sec=business

x 0 我要送花

x 15
发表于 2012-5-2 18:14 | 显示全部楼层
Eversendai looks to gain local ground in ‘big way’

KUALA LUMPUR: Having built a large bulk of its fortunes in the Middle East, Eversendai Corp Bhd is looking at gaining ground domestically.

“We are looking at Malaysia in a big way as time goes by,” its executive chairman and managing director Datuk A K Nathan told The Edge Financial Daily.

“We have already concluded the Manjung and (the extension of) Tanjung Bin power plants. This is just the beginning towards the future for Eversendai to expand its construction activities.”

Last year, barely 7.4% of the group’s RM1.033 billion revenue was generated from Malaysian projects. Jobs in the Middle East accounted for 86.3% of Eversendai’s revenue while 6.3% was from Indian projects. Nathan said Eversendai is eyeing local projects to build high-rise towers. The structural steel turnkey and power plant contractor plans to “take the construction development in Malaysia to a new dimension” by introducing the innovative and modern construction approach that has worked for it in the Middle East, which includes using composite structure for construction instead of the conventional reinforced concrete.

Composite structures, Nathan explained, use a combination of structural steel and concrete. They are ideal for buildings of 25 stories or higher. While many assume that using steel is expensive, he said the new structure could in fact save the property developer money in various ways. The
construction of the buildings would take 30% less time than purely concrete buildings, and this could also allow for smaller rooms with subsequently more net lettable area.

Nathan was positive on the opportunities with having the advantage to offer structural steel construction, saying, “I’m very positive we will be able to venture into this [in Malaysia]”. Eversendai has the benefit of being a “one-stop” shop, providing design, engineering, procurement, fabrication and erection for the overall structural steel works.

At the moment, Nathan said his group has only gone as far as submitting design proposals for projects but did not elaborate.

An analyst with MIDF Research believed that Eversendai would stand to benefit from Malaysia’s concrete landscape becoming more modern and having more structural steel buildings in the future.

“Malaysia is catching up,” he said. He cited Menara Warisan Merdeka and the Kuala Lumpur International Financial District as possible projects that Eversendai could particularly gain from.

The group’s total order book last year of RM1.4 billion comprised 48% of structural steel projects, 37% of civil engineering projects (using reinforced concrete), and 15% of power plant projects. Eversendai’s past projects in Malaysia included the Petronas Tower 2, and the roof structure of the main terminal building and the contact pier at the Kuala Lumpur International Airport.

Other sectors the group is looking at locally include the mass rapid transit projects, as well as fabrication works in the oil and gas industry, including Petroliam Nasional Bhd’s Refinery and Petrochemical Integrated Development project in Pengerang, reportedly to begin mid-2013.

The expansion of its job scope into areas besides civil engineering and structural steel construction is part of Eversendai’s five-year growth plan to post an annual turnover of RM2 billion within the next five years.

Eversendai recently announced two new projects in the Gulf region. The first is a sub-contractor role to erect structural steel works for the railway station in Phase 1 of the King Abdul Aziz International Airport Development Project located in Jeddah, Saudi Arabia, worth 193 million Saudi Arabian riyal (RM155.73 million), and the second is a sub-contractor project for the National Museum of Qatar, worth 160 million Qatari riyal (RM132.97 million).

Many of the construction projects are already completed or initiated in the Middle East. However, Nathan does not see the likelihood of a slowdown in the Persian Gulf. “Business in the Middle East is growing steadily and opportunities are encouraging,” he said.

Since its debut on Bursa Malaysia’s Main Market in July last year, Eversendai’s share price has been moving in a tight range.

The stock closed at RM1.69, compared with its IPO price of RM1.62.

“It’s because of the illiquidity of the stock... there is not enough of shares on the open market,” said Nathan, who holds a 70% equity stake in the company.

Other major shareholders are the Employees Provident Fund holding 7%, Tabung Haji 3.7% and Permodalan Nasional Bhd 3.5%. These few shareholders, including Nathan, collectively hold 84.2% of the shares in Eversendai.

“The institutions hold onto the stock... the free float is very little,” the analyst said.

This article appeared in The Edge Financial Daily, May 3, 2012.

http://www.theedgemalaysia.com/i ... und-in-big-way.html

x 0 我要送花

x 49
发表于 2012-5-23 18:57 | 显示全部楼层
Financial Results
Reference No EC-120523-64431

Company Name
:
EVERSENDAI CORPORATION BERHAD
Stock Name
:
SENDAI  
Date Announced
:
23/05/2012
Financial Year End
:
31/12/2012
Quarter
:
1
Quarterly report for the financial period ended
:
31/03/2012
The figures
:
have not been audited

Converted attachment :



Please attach the full Quarterly Report here:
ECB Quarterly Report 31 Mar 2012.pdf
Press release - 1QFY2012.pdf


Remark:








Currency
:
Malaysian Ringgit (MYR)

SUMMARY OF KEY FINANCIAL INFORMATION
31/03/2012

INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
31/03/2012
31/03/2011
31/03/2012
31/03/2011
$$'000
$$'000
$$'000
$$'000
1Revenue
248,961
207,850
248,961
207,850
2Profit/(loss) before tax
31,253
26,328
31,253
26,328
3Profit/(loss) for the period
29,762
25,477
29,762
25,477
4Profit/(loss) attributable to ordinary equity holders of the parent
27,249
22,559
27,249
22,559
5Basic earnings/(loss) per share (Subunit)
3.52
2.91
3.52
2.91
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00








AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.9500
0.9300

Remarks :


Definition of Subunit:
In a currency system, there is usually a main unit (base) and subunit that is a fraction amount of the main unit.
Example for the subunit as follows:

Country Base Unit Subunit
Malaysia Ringgit Sen
United States Dollar Cent
United Kingdom Pound Pence


© 2012, Bursa Malaysia Berhad. All Rights Reserved.

x 0 我要送花

x 15
发表于 2012-5-23 19:30 | 显示全部楼层
Eversendai 1Q net profit up 20.78% to RM27.25m

KUALA LUMPUR (MAY 23): Eversendai Corporation Bhd net profit for the first quarter ended March 31, 2012 rose 20.78% to RM27.25 million from RM22.56 million a year earlier, on the back of a 19.77% increase in revenue to RM248.96 million from RM207.85 million in 2011.

Earnings per share was 3.53 sen compared to 291 sen previously, while net assets per share ws 95 sen.

Eversendai executive chairman and group managing director Datuk A. K. Nathan in a statement Wednesday said the company’s overall performance had been consistent with its outlook when presenting its 2011 full-year results.

Our current strong order book of RM1.9 billion and this supported by strategic wins in both the domestic and international businesses and growth verticals, continues to give us good visibility in FY2012 and into FY2013.”

“The underlying fundamentals of our industry and particularly in the markets that we operate in remain very sound, with countries in the region continuing to roll out major infrastructure projects. In the Middle East, India and in Malaysia, there is a healthy pipeline of potential commercial projects which we are actively pursuing,” he said.

Nathan said Eversendai started the year promisingly with securing several strategic new contracts totaling RM772 million of which a substantial portion was from Malaysia,”

He said some of the large new contracts won during this period were Tanjung Bin 4 Power Plant Project, Malaysia valued at RM367 million; Yas Mall Project, Abu Dhabi valued at RM34 million; King Abdul Aziz International Airport (KAIA) Railway Station Project, Jeddah, KSA valued at RM157 million and the National Museum of Qatar (Package 2) in Doha, Qatar valued at RM134 million.

http://www.theedgemalaysia.com/b ... 78-to-rm2725m-.html

x 0 我要送花

x 123
发表于 2012-5-24 17:40 | 显示全部楼层
Entitlements (Notice of Book Closure)
Reference No EC-120524-54806

Company Name
:
EVERSENDAI CORPORATION BERHAD
Stock Name
:
SENDAI   
Date Announced
:
24/05/2012

EX-date
:
05/07/2012
Entitlement date
:
09/07/2012
Entitlement time
:
05:00:00 PM
Entitlement subject
:
First and Final Dividend
Entitlement description
:
First and final single tier dividend of 1 sen per share for the financial year ended 31 December 2011.
Period of interest payment
:
to
Financial Year End
:
31/12/2011
Share transfer book & register of members will be
:
09/07/2012 to 09/07/2012 closed from (both dates inclusive) for the purpose of determining the entitlements
Registrar's name ,address, telephone no
:
Symphony Share Registrars Sdn Bhd
Level 6, Symphony House
Pusat Dagangan Dana 1
Jalan PJU 1A/46
47301 Petaling Jaya
Selangor
Tel No. 03-78418000
Payment date
:
23/07/2012

a.

Securities transferred into the Depositor's Securities Account before 4:00 pm in respect of transfers
:
09/07/2012

b.

Securities deposited into the Depositor's Securities Account before 12:30 pm in respect of securities exempted from mandatory deposit
:

c.

Securities bought on the Exchange on a cum entitlement basis according to the Rules of the Exchange.
Number of new shares/securities issued (units) (If applicable)
:
Entitlement indicator
:
Currency
Currency
:
Malaysian Ringgit (MYR)
Entitlement in Currency
:
0.01

Remarks :
The first and final single tier dividend of 1 sen per share for the financial year ended 31 December 2011 is subject to the approval of shareholders of Eversendai Corporation Berhad at the 9th Annual General Meeting to be held on Tuesday, 19 June 2012 at the Mahkota III Ballroom, Hotel Istana Kuala Lumpur City Centre, 73 Jalan Raja Chulan, 50200 Kuala Lumpur, Malaysia.

x 0 我要送花

x 15
发表于 2012-6-19 13:37 | 显示全部楼层
Eversendai eyeing to acquire O&G, manufacturing companies, says MD

KUALA LUMPUR (June 19): Eversendai Corporation Bhd is eyeing several companies ranging from oil and gas entities to manufacturing companies in a bid achieve its RM2 billion in revenue by 2016,group managing director Datuk A K Nathan said.

"Apart from our core business, we have to acquire some other businesses related to our core. I foresee within the next couple of months we will be announcing the new acquisitions," he said after the company's annual general meeting on Tuesday.

Although more than half of the group's revenue came from the Middle East, Nathan said, it was exploring opportunities in Vietnam, Indonesia, Singapore as well as neighboring Commonwealth of Independent States countries.

http://www.theedgemalaysia.com/b ... anies-says-md-.html

x 0 我要送花

x 470
发表于 2012-6-19 21:42 | 显示全部楼层
艾华仙台洽谈併购 
2016达20亿营收目標

財经 2012年6月19日

(吉隆坡19日讯)2011財政年(12月31日结账)成功突破10亿令吉营业额的艾华仙台(SENDAI,5205,主板建筑股),將首次展开併购行动,以冀在2016年达到20亿令吉营业额的目標。

艾华仙台执行主席兼董事经理拿督AK纳登表示,有意进军与现有业务具关联性的新业务,包括油气和製造业,以扩大其营业额规模。

目前,该公司正和2至3家潜在的併购对像进行洽谈,惟一切尚无定案,包括收购价格。

「洽购过程可说已达致30%至40%的进展,目前看来相当有可能成事。或许在未来数月,我们就会敲定並公佈相关详情。」

纳登是在艾华仙台股东常年大会后,在记者会作有关披露。陪同出席者包括该公司执行董事兼首席营运员罗汉拉兹、执行董事兼区域总监纳拉劳勿、执行董事纳里斯和孙塔拉。

不会轻举妄动

虽然併购行动是为了把艾华仙台带入另一个发展阶段,但纳登也强调,不会为了提升业绩表现而轻举妄动,並將確保收购对象可为其现有业务带来增值效益,以及维持其工程品质和按时交货的经商理念。

对於市场看好艾华仙台可获得阿布扎比国际机场(ADIA)扩充工程的钢铁架构承包合约,纳登表示,凭该公司在新多哈国际机场工程中展现的良好记录,確实有望在ADIA工程项目中,贏得钢铁架构的承包合约。

纳登补充说,儘管大马业务目前仅佔其5%的营业额,但隨著丹绒宾(Tanjung Bin)发电厂和曼绒(Manjung)发电厂工程即將启动,该比重料將走高至15%。

「但是,若我们获得阿布扎比国际机场扩充工程的合约,该比重又將回落。」目前,中东地区和印度业务分別贡献85%和10%的营业额。

年初至今,艾华仙台仍未曾获得来自印度的合约。纳登披露,该公司在印度採取谨慎的策略,包括竞標的工程和客户对象。

「我们评估了数项工程,价格都无法令我们满意。当遇见优渥的价格和良好的对象,我们將参与竞標相关工程。」

他补充,其在印度崔奇(Trichy)第5家新工厂的建设工程遭到耽误,因未获得当地政府的批准已启动工程,惟仍预料可在明年首季完成。

http://www.orientaldaily.com.my/ ... 6-20&Itemid=198

x 0 我要送花

x 15
发表于 2012-6-21 22:36 | 显示全部楼层
Eversendai wins RM45.9m iron ore job

Eversendai Corp Bhd, via its subsidiary, Shineversendai Engineering (M) Sdn Bhd, has been appointed as a supplier for the iron ore distribution project at Teluk Rubiah, Manjung, Perak.

The contract value between Shineversendai and Vale Malaysia Minerals Sdn Bhd is worth RM45.9 million for a period of 12 months, Eversendai said in a statement.

The project is expected to be completed by 2013 and the scope encompasses the supply of structural steel for pipe and cable rack as well as other miscellaneous works.

Datuk A.K. Nathan, Executive Chairman and Group Managing Director of Eversendai said: "We have stressed our keen interest to further expand our business portfolio in Malaysia and are delighted to announce the securing of another project which strengthens our presence in the local arena.

"The winning of this project will indisputably add more value to our current standing in Malaysia and overseas as a major premium contractor for structural steel works on high-rise buildings, commercial buildings, roof structures, stadiums, bridges, industrial, chemical and power plants.

"Besides that, we have solidified our position with a strong track record that speaks volume of the quality and adherence to safety." -- Bernama

Read more: Eversendai wins RM45.9m iron ore job http://www.btimes.com.my/Current ... _html#ixzz1yRG63uxx

x 0 我要送花

x 15
发表于 2012-8-7 09:01 | 显示全部楼层
Eversendai's success inspires BlueScope

BUILDING UP REPUTATION: Firm banks on Ranbuild product offering SHAH ALAM

BLUESCOPE Engineering Systems Sdn Bhd (BESSB), a unit of Australia-listed BlueScope Steel Ltd, aims to earn a reputation like Eversendai Corp Bhd through its Ranbuild product offering.

"We want to be like Eversendai but on a smaller scale. That is why we are investing now and constructing buildings to the span of 100 feet," BESSB general manager Leong Wai Yuan said.

Eversendai, an integrated structural steel turnkey contractor, earned its reputation for having been involved in the world's tallest buildings, starting with the Petronas Twin Towers, and then, United Arab Emirate's Burj Dubai.

"It is a blessing we belong to BlueScope Steel. The group has earned its right in the market and that gives us an opportunity to move forward," Leong told Business Times in an interview recently.

BlueScope Steel is the largest steel group in Australia and Asia. It is the market leader in Australia, in terms of the Ranbuild product offering.

Ranbuild is a durable galvanized-steel pre-engineered building solution, that is similar to the Ikea-model of do-it-yourself.

BlueScope Steel is not new to Malaysia, having forayed here over 40 years ago with its unique product offerings.

Its 60 per cent unit, BlueScope Lysaght Malaysia, set up in 1968, was the first to introduce long length, cut-to-order roofing products, in what was then a market dominated by asbestos sheeting and cheap zinc-coated corrugated sheet.

The Australian group also has a 60 per cent interest in BlueScope Steel (Malaysia) Sdn Bhd, a flat steel products maker, with Permodalan Nasional Bhd holding the rest of the stake.

http://www.btimes.com.my/Current ... /RANBUILD2/Article/

x 0 我要送花

x 321
发表于 2012-8-21 15:00 | 显示全部楼层
与捷运承包商洽商 Eversendai参与建造钢铁架构

二零一二年八月十五日 晚上十一时四十九分

(吉隆超15日讯)Eversendai机构有限公司(SENDAI,5205,建筑组)正与捷运双溪毛糯-加影线的获授权者进行磋商,以着手这项300亿令吉铁道计划中的部分钢铁工程。创办人兼主席拿督纳丹表示,钢铁制造商拥有庞大机会参与,因大部分捷运站和所有车站将以钢铁建造。

“我们对前景非常乐观。我们看到架构钢铁方面的庞大商机。”

纳丹指出,身为马来西亚最大基建计划的捷运,将协助Eversendai机构达到目标,增加马来西亚业务对该集团整体营业额的贡献。

他说:“目前,马来西亚业务的贡献只有约6.3%。今年,我们预料将触及8%。”

“我们已经设定目标明年至少达到12%至15%。若我们成功赢得一些合约,捷运计划将扮演重要角色。”

建议中3条铁道中第一条的捷运双溪毛糯-加影线,全长51公里,拥有31个车站。

上述计划将分为85个工程配套,而40个投标商已经受委。

除了捷运,其子公司Shineversendai工程(马)私人有限公司,已经受委为霹雳曼绒直落卢比亚铁矿分销计划的供应商,计划价值4590万令吉。

该公司最近也受委为德山大马位于民都鲁总值3710万令吉多晶硅计划钢铁架构建造与建立工程的主要附属承包商。

除了投标相关Eversendai机构核心业务的新计划,该承包商也已晋身马来西亚利用综合架构高层塔楼的主要承包商。

“我们已经透过引入革新的高楼综合架构,为集团建立新商业机会。”

“Eversendai机构已与一些展示兴趣的本地发展商洽谈,以利用上述创新建筑技术。”

Eversendai机构将投资约3000万令吉以扩充其于万挠的建造设备。

该公司已计划把喷漆部门迁至新工厂,同时提升现有工厂的建造产能。

“这原不在我们的计划之中,但随着我们在马来西亚攫获更多业务,我认为拥有加强的设备是合适的。”

“透过新设备,我们将可扩大整体业务,最终协助推高营业额和盈利。”

纳丹指出:“上述新工厂的设备与建筑将耗资高达1500万令吉,而余额则用作购买地段。”

http://www.kwongwah.com.my/news/2012/08/15/122.html

x 0 我要送花

x 15
发表于 2012-8-30 13:41 | 显示全部楼层
Quarterly rpt on consolidated results for the financial period ended 30/6/2012
EVERSENDAI CORPORATION BERHAD
30/08/2012 01:28:21 PM

Financial Year End31/12/2012
Quarter2
Quarterly report for the financial period ended30/06/2012
The figureshave not been audited
Attachments

ECB Quarterly Report 30 June 2012.pdf
636 KB

Press release - 2QFY2012.pdf
250 KB


  • Default Currency
  • Other Currency

Currency: Malaysian Ringgit (MYR)
SUMMARY OF KEY FINANCIAL INFORMATION
30/06/2012
[tr][/tr]
INDIVIDUAL PERIOD
CUMULATIVE PERIOD
CURRENT YEAR QUARTER
PRECEDING YEAR
CORRESPONDING
QUARTER
CURRENT YEAR TO DATE
PRECEDING YEAR
CORRESPONDING
PERIOD
30/06/2012
30/06/2011
30/06/2012
30/06/2011
$$'000
$$'000
$$'000
$$'000
1Revenue
257,699
258,145
506,660
465,995
2Profit/(loss) before tax
33,866
42,482
66,119
68,810
3Profit/(loss) for the period
32,303
40,843
62,065
66,320
4Profit/(loss) attributable to ordinary equity holders of the parent
30,492
34,034
57,741
56,593
5Basic earnings/(loss) per share (Subunit)
3.94
4.40
7.46
7.31
6Proposed/Declared dividend per share (Subunit)
0.00
0.00
0.00
0.00


AS AT END OF CURRENT QUARTER
AS AT PRECEDING FINANCIAL YEAR END
7
Net assets per share attributable to ordinary equity holders of the parent ($$)
0.9900
0.9200
Definition of Subunit:
In a currency system, there is usually a main unit (base) and subunit that is a fraction amount of the main unit.
Example for the subunit as follows:

CountryBase UnitSubunit
MalaysiaRinggitSen
United StatesDollarCent
United KingdomPoundPence





Announcement Info
Company NameEVERSENDAI CORPORATION BERHAD  
Stock Name SENDAI   
Date Announced30 Aug 2012
CategoryFinancial Results
Reference NoEC-120830-41350

x 0 我要送花

x 18
发表于 2012-9-1 00:08 | 显示全部楼层
依华建台净利跌10%
财经新闻 财经  2012-08-31 09:52

(吉隆坡30日讯)依华建台(Sendai,5205,主板基建股)现财年次季净利滑落10.41%至3049万2000令吉,上财年同期录得3403万4000令吉。营业额则下跌0.17%至2亿5769万9000令吉。上半年净利和营业额分别增2.03%和8.73%至5774万1000令吉和5亿666万令吉。依华建台表示,营业额表现出色受益于大马和印度的工程增长,而盈利表现逊色则是受到外汇亏损所影响。依华建台次季和上半年的每股盈利分别达3.94仙和7.46仙。

x 0 我要送花

x 18
发表于 2012-9-1 01:19 | 显示全部楼层
Eversendai H1 revenue up on more projects


KUALA LUMPUR: Eversendai Corp Bhd has reported a sustainable revenue and profit after tax of RM257.7mil and RM32.3mil for its second quarter ended June 30, respectively.

Last year its accounted revenue and profit after tax for the same period was RM258.15mil and RM40.84mil, respectively.

For the first half ended June 30, the group’s revenue and profit after tax stood at RM506.66mil and RM62.07mil respectively, compared with RM466mil and RM66.32mil in the previous corresponding period.


Nathan: ‘The (second) quarter played out as we expected.’

“The increase in revenue of 8.73% is mainly due to increase in projects undertaken in Malaysia and India while the slight fall in profit after tax is due to unrealised foreign exchange translation losses,” it said in a statement.

The company’s current order book stands at RM1.7bil as of June 30, 2012.

About 41% of the projects were based on structural steel segment followed by 34% from power plant and 25% from civil construction segment.

“The quarter played out as we expected. Our strategy of tightly integrating and remain focus on our core business substantially strengthen the group’s position as a full-fledged and dynamic structural steel turnkey contractor and a specialist in industrial, petrochemical and power plant,” Datuk A.K. Nathan, executive chairman and group managing director, said in the statement.

“Eversendai is also aggressively exploring various business opportunities in Malaysia and other neighbouring countries in Asean besides penetrating into the Commonwealth Independent States. As for Saudi Arabia, we are moving forward to intensify our footprint in a market well familiarised in the last two decades while constantly churning to meet the high demand for power in India.”

According to Nathan, a new company named Vahana Constructions Sdn Bhd had been created to expand into the general construction industry in view of the numerous opportunities that were available in Malaysia and regionally.

“We are leveraging on our financial strength and established track record in certain niche areas, particularly the power plant and oil and gas sector, which are expected to generate higher profits,” he said.

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册

x

x 0 我要送花

x 15
发表于 2012-10-9 15:08 | 显示全部楼层
Eversendai eyeing jobs worth RM500mil

Structural steel construction company Eversendai Corp Bhd is confident of securing contracts worth RM500 million in Malaysia within the next few months, says Executive Chairman and Group Managing Director Datuk A.K. Nathan.

"We will bring the experience we have gained overseas into the country and perhaps change the construction approach itself.

"Presently, we have RM1.7 billion worth of jobs in hand and we have bid for some RM12 billion worth of jobs, which would last us for three years.

"There are certain difficulties in terms of the overall global environment but our excellent reputation has placed us in a good position to garner support from clients," Nathan told reporters after delivering a keynote address at the one-day CPA Congress 2012.


When it comes to project bidding, he said the group's focus was in the Middle East, however, Malaysia was developing rapidly than anticipated as a result of the Economic Transformation Programme.

"There is a fair amount of opportunities in the Southeast Asian region at large and we are also looking at India but with caution," he said.

Nathan was optimistic that group revenue of RM2 billion, targeted within the next five years, could be achieved earlier and that shareholders would receive better dividends this year.

"On mergers and acquisitions, we are working towards that direction and some may materialise within the next two to three months. It could be in the Middle East, Singapore or Malaysia.

"It's not a major merger and acquisition but it's very related to the business we are in. What I can say is that it is 'cooking', but the aroma has not come out yet," he added. Bernama

http://www.btimes.com.my/Current ... /Article/index_html

x 0 我要送花

x 0
发表于 2012-11-10 11:21 | 显示全部楼层
這股是不是被低估了?或者MRT工程沒標到?

x 0 我要送花

x 0
发表于 2012-11-10 14:03 | 显示全部楼层
回复 35# mickaelp

根据一些报章上读到的分析,他们提到这公司『盈利能见度低』。我的财经知识不大好。我猜是因为大部分业务都在海外,所以不容易跟进观察吧。

x 0 我要送花

x 18
发表于 2012-11-26 21:54 | 显示全部楼层
淨利微跌3.5% 依華仙台派息2仙
財經26/11/2012 18:34

(吉隆坡26日訊)依華仙台(SENDAI,5205,主要板建築)受大馬及印度工程帶動,第3季營業額按年增5.6%至2億4025萬令吉,宣佈每股派息2仙。

 不過,由于西亞工程新項目及已竣工項目青黃不接,新工程尚處初階,該公司第3季淨利按年減少3.5%至2551萬3000令吉,不影響公司宣佈2仙派息。

 截至9月底首3季,該公司淨利仍按年微揚0.3%至8325萬4000令吉,營業額則按年增3.7%至7億4691萬令吉。

 依華仙台向馬證交所報備指出,大馬單季業務盈利淨增3倍抵銷西亞盈利減少劣勢,目前持有總值15億令吉訂單,45.5%仍來自西亞,大馬及印度分佔35.6%及18.9%。

 文告指出,鋼鐵架構工程貢獻大部分,佔營業額73.6%;發電廠工程及木土建築工程則分別貢獻17.1%及9.3%。

 該公司指出,今年至今已囊擴總值9億2390萬令吉合約,相信將超越去年全年10億7000萬令吉獲得合約總值。

x 0 我要送花

x 18
发表于 2012-11-26 22:01 | 显示全部楼层
Eversendai Q3 earnings dip 3.5% to RM25.5m, new contracts RM924m
Published: Monday November 26, 2012 MYT 2:19:00 PM

KUALA LUMPUR: Eversendai Corporation Bhd's slipped 3.5% to RM25.51mil in the third quarter ended Sept 30, 2012 from RM26.44mil a year ago but it was upbeat about the outlook, with new contracts valued at RM923.9mil.

It said on Monday its revenue declined 5.5% to RM240.25mil from RM254.41mil. Earnings per share were 3.30 sen compared with 3.42 sen. It declared an interim dividend of 2.0 sen per share.

Eversendai's earnings for the nine-month period were flat at Rm83.25mil compared with RM83.03mil a year ago. However, its revenue grew 3.7%, or RM26.50mil, to RM746.91mil.

"With over 20 on-going projects, the group's revenue continued to be predominantly driven by its operations in the Middle East, which accounted for 68.9% of its revenue portfolio," it said.

The company said revenue from operations in Malaysia and India contributed 15.6% and 15.5% respectively. Major on-going projects in Malaysia include the 1,000MW Manjung Coal-Fired Power Plant and 1,000MW Tanjung Bin Coal-Fired Power Plant while sizeable projects in India are Worli Mixed Use Development, Mumbai and EMCO Thermal Power Project, Maharashtra.

"Todate, the group has successfully secured new contracts with a total value of RM923.9mil and is targeting to exceed last year's total value of new contracts won amounting to RM1.07bil.

"With a current order book of RM1.5bil, power plant projects account for the largest portion at 36.4% (or RM558mil), followed closely by structural steel projects at 36.3% (or RM556.5mil) and civil construction projects at 27.3% (or RM419.1mil).

Of the order book, 45.5% was from operations in the Middle East, 35.6% from Malaysia and 18.9% from India.

x 0 我要送花

x 470
发表于 2012-11-27 11:53 | 显示全部楼层
中東工程和外匯影響
依文仙台第三季淨利跌3.5%

大馬業績出爐 2012-11-27 11:13

(吉隆坡26日訊)受中東工程時機差異和外匯虧損影響,依文仙台(SENDAI,5205,主板建筑組)截至2012年9月30日止第三季淨利按年微跌3.49%至2千551萬3千令吉,惟9個月淨利仍略增0.27%,達8千325萬4千令吉。

第三季營業額報2億4千零25萬4千令吉,按年下滑5.56%,9個月營業額則漲3.68%至7億4千691萬4千令吉。

依文仙台發文告說,大馬和印度業務分別錄得305.1%和49.9%毛利成長,其中大馬盈利主要來自曼絨和丹絨賓發電廠貢獻,惟貢獻比重最高的中東業務毛利下滑17.8%,拖累整體盈利成長。

該公司管理層認為,集團目前握有超過15億令吉訂單,而且業務組合頗為多元,對未來展望持樂觀看法,同時相信大馬和印度業務比重將逐步上揚。(星洲日報/財經)

http://biz.sinchew.com.my/node/67609

x 0 我要送花

x 470
发表于 2012-11-30 09:31 | 显示全部楼层
艾华仙台:承接海外工程要谨慎
財经 2012年11月29日
     
(斯里肯邦岸29日讯)艾华仙台(Sendai,5205,主板建筑股)董事经理拿督AK纳登指出,承接海外工程有一定的挑战,因此,有兴趣接海外工程的建筑公司,不只需要有强稳的財务,在承接这些工程时也必须谨慎。

纳登是在2012年国际建筑钢铁大会上,分享本身经验时对建筑业者提出建言。

他表示,如果一家公司行事谨慎,管理层凡事亲力亲为,有可以信赖的人负责管理,这样的一家公司必然可以在国际市场游刃有余。

纳登也在大会上分享管理海外工程计划的挑战,以及艾华仙台的成功经验。

他也指出,有意进军海外市场的公司,不应该太依赖单一客户,或单一国家市场,应该要多元化。否则將承受更高的风险,特別是在出现经济危机的时候。

纳登透露,艾华仙台进军海外的第一个市场是新加坡,当时该公司並没有向政府要求任何的援助,目前该公司在海外已经有6个立足点。

纳登也建议有意走出大马的本地业者,多了解他们的目標市场的商业运作常规等细节。

他认为,多了解这些地区的文化,人民的思维、工作模式、合约条例、劳工条例及成本,知己知彼,才能够提高胜算。

http://www.orientaldaily.com.my/ ... 235:&Itemid=198

x 0 我要送花

发表回复

您需要登录后才可以回帖 登录 | 注册 |

本版积分规则

Google 搜索本站 搜索WWW

快速回复 返回顶部 返回列表